Since the construction of a nuclear power plant (NPP) requires a very long period, we have to wait for a long time before getting return on the investment. Furthermore, it is unfavorable that the longer construction period makes the construction cost higher. In order to improve these issues, we are studying the way of shortening construction period for the ABWR. In the previous study, we introduced a concept for shortening construction period and master schedule (M/S) based on the large-scale module method. In this study, we have developed the advanced concept for shortening construction period of the ABWR plant based on the rearrangement of its general arrangement (GA) and the application of large-scale composite modules. The estimated construction period is 22.5 months from the 1st concrete work to the fuel loading (F/L).
Skip Nav Destination
12th International Conference on Nuclear Engineering
April 25–29, 2004
Arlington, Virginia, USA
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
0-7918-4687-3
PROCEEDINGS PAPER
Study on the Advanced Concept for Shortening Construction Period of ABWR Plant
Hiroshi Ijichi,
Hiroshi Ijichi
Tokyo Electric Power Company, Tokyo, Japan
Search for other works by this author on:
Takashi Satoh,
Takashi Satoh
Tokyo Electric Power Company, Tokyo, Japan
Search for other works by this author on:
Tadashi Yamane,
Tadashi Yamane
Tokyo Electric Power Company, Tokyo, Japan
Search for other works by this author on:
Tomohiro Fujita,
Tomohiro Fujita
Tokyo Electric Power Company, Tokyo, Japan
Search for other works by this author on:
Masahiro Tsutagawa,
Masahiro Tsutagawa
Toshiba Corporation
Search for other works by this author on:
Yoshihiro Orito
Yoshihiro Orito
Shimizu Corporation
Search for other works by this author on:
Hiroshi Ijichi
Tokyo Electric Power Company, Tokyo, Japan
Takashi Satoh
Tokyo Electric Power Company, Tokyo, Japan
Tadashi Yamane
Tokyo Electric Power Company, Tokyo, Japan
Tomohiro Fujita
Tokyo Electric Power Company, Tokyo, Japan
Masahiro Tsutagawa
Toshiba Corporation
Hiroya Mori
Toshiba Corporation
Shizuka Hirako
Hitachi, Ltd.
Kouichi Murayama
Hitachi, Ltd.
Hisato Sakakibara
Kajima Corporation
Yoshihiro Orito
Shimizu Corporation
Paper No:
ICONE12-49321, pp. 439-446; 8 pages
Published Online:
November 17, 2008
Citation
Ijichi, H, Satoh, T, Yamane, T, Fujita, T, Tsutagawa, M, Mori, H, Hirako, S, Murayama, K, Sakakibara, H, & Orito, Y. "Study on the Advanced Concept for Shortening Construction Period of ABWR Plant." Proceedings of the 12th International Conference on Nuclear Engineering. 12th International Conference on Nuclear Engineering, Volume 1. Arlington, Virginia, USA. April 25–29, 2004. pp. 439-446. ASME. https://doi.org/10.1115/ICONE12-49321
Download citation file:
7
Views
Related Proceedings Papers
Related Articles
Homogenization of Quasi-Periodic Structures
J. Vib. Acoust (August,2006)
Developing Innovative Deep Water Pipeline Construction Techniques with Physical Models
J. Offshore Mech. Arct. Eng (February,2007)
Technical Evaluation Method of Mechanical Equipment Item Substitution in the Procurement and Construction Process of Nuclear Power Plant
ASME J of Nuclear Rad Sci (January,2023)
Related Chapters
Time-History Performance of Reference Surfaces
The Tire Pavement Interface
Contextual Intervention/Technical Invention
Exterior Wall Systems: Glass and Concrete Technology, Design, and Construction
Nondestructive Testing/Examination in the Construction Industry
Nondestructive Testing Standards: Present and Future