ASME Code Case N-658, “Risk-Informed Safety Classification for Use in Risk-Informed Repair/Replacement Activities” and Code Case N-660, “Alternative Repair/Replacement Requirements For Items Classified In Accordance With Risk-Informed Processes” are being completed to expand the breadth of risk-informed requirements for pressure-retaining items. This initiative, which is built from prior ASME Section XI risk-informed inservice inspection developments over the past decade, has been undertaken in conjunction with U.S. risk-informed regulation efforts. The U.S. Nuclear Regulatory Commission (NRC) is working with the industry on risk informing Title 10 Code of Federal Regulations Part 50 (10CFR50). The Nuclear Regulatory Commission’s basic proposal is to allow modification of some of the special treatment requirements of 10CFR50. Their effort is proceeding via an Advanced Notice of Public Rulemaking, March 3, 2000, and an announcement of Availability of Draft Rule Wording, November 29, 2001, to add 10 CFR 50.69, “Risk-Informed Treatment of Structures, Systems and Components.” A parallel task by the Nuclear Energy Institute (NEI) to develop a guideline on how to implement the results of the rulemaking is also well underway via NEI 00-04 (Draft Revision B), “Option 2 Implementation Guideline,” May 2001. This paper summarizes the content and status of approval of the proposed ASME Code Cases, including how they relate to the above NRC and NEI efforts. Some initial results from trial application of the Code Cases will also be cited.
Skip Nav Destination
10th International Conference on Nuclear Engineering
April 14–18, 2002
Arlington, Virginia, USA
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
0-7918-3598-7
PROCEEDINGS PAPER
Developments on ASME Code Cases to Risk-Inform Repair/Replacement Activities in Support of Risk-Informed Regulation Initiatives
Kenneth R. Balkey,
Kenneth R. Balkey
Westinghouse Electric Company, LLC, Pittsburgh, PA
Search for other works by this author on:
William C. Holston
William C. Holston
Calvert Cliffs Nuclear Power Plant, Inc., Lusby, MD
Search for other works by this author on:
Kenneth R. Balkey
Westinghouse Electric Company, LLC, Pittsburgh, PA
William C. Holston
Calvert Cliffs Nuclear Power Plant, Inc., Lusby, MD
Paper No:
ICONE10-22733, pp. 649-660; 12 pages
Published Online:
March 4, 2009
Citation
Balkey, KR, & Holston, WC. "Developments on ASME Code Cases to Risk-Inform Repair/Replacement Activities in Support of Risk-Informed Regulation Initiatives." Proceedings of the 10th International Conference on Nuclear Engineering. 10th International Conference on Nuclear Engineering, Volume 4. Arlington, Virginia, USA. April 14–18, 2002. pp. 649-660. ASME. https://doi.org/10.1115/ICONE10-22733
Download citation file:
7
Views
Related Proceedings Papers
Related Articles
Optimizing Battery Maintenance and Reliability in Ground Control Station for Tethered High-Altitude Platforms
ASME J. Risk Uncertainty Part B (June,2025)
Development of Risk Informed Aging Management Program in Decommissioning
ASME J of Nuclear Rad Sci (January,2025)
Forecasting Repair and Maintenance Services of Medical Devices Using Support Vector Machine
J. Manuf. Sci. Eng (March,2022)
Related Chapters
Subsection NG — Core Support Structures
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 1, Fourth Edition
Subsection NE—Class MC Components
Companion Guide to the ASME Boiler & Pressure Vessel Codes, Volume 1 Sixth Edition
IWE and IWL
Companion Guide to the ASME Boiler & Pressure Vessel Codes, Volume 2, Sixth Edition