The IRIS (International Reactor Innovative and Secure) project has completed the conceptual design phase and is moving towards completion of the preliminary design, scheduled for the end of 2002. Several other papers presented in this conference provide details on major aspects of the IRIS design. The three most innovative features which uniquely characterize IRIS are, in descending order of impact: 1. Safety-by-design, which takes maximum advantage of the integral configuration to eliminate from consideration some accidents, greatly lessen the consequence of other accident scenarios and decrease their probability of occurring; 2. Optimized maintenance, where the interval between maintenance shutdowns is extended to 48 months; and 3. Long core life, of at least four years without shuffling or partial refueling. Regarding feature 1, design and analyses will be supplemented by an extensive testing campaign to verify and demonstrate the performance of the integral components, individually as well as interactive systems. Test planning is being initiated. Test results will be factored into PRA analyses under an overall risk informed regulation approach, which is planned to be used in the IRIS licensing. Pre-application activities with NRC are also scheduled to start in mid 2002. Regarding feature 2, effort is being focused on advanced online diagnostics for the integral components, first of all the steam generators, which are the most critical component; several techniques are being investigated. Finally, a four year long life core design is well underway and some of the IRIS team members are examining higher enrichment, eight to ten year life cores which could be considered for reloads.
Skip Nav Destination
10th International Conference on Nuclear Engineering
April 14–18, 2002
Arlington, Virginia, USA
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
0-7918-3596-0
PROCEEDINGS PAPER
IRIS: Proceeding Towards the Preliminary Design
Mario D. Carelli,
Mario D. Carelli
Westinghouse Electric Company, Pittsburgh, PA
Search for other works by this author on:
C. Lombardi,
C. Lombardi
Polytechnic of Milan, Milano, Italy
Search for other works by this author on:
N. Todreas,
N. Todreas
Massachusetts Institute of Technology, Cambridge, MA
Search for other works by this author on:
E. Greenspan,
E. Greenspan
University of California at Berkeley, Berkeley, CA
Search for other works by this author on:
Mario D. Carelli
Westinghouse Electric Company, Pittsburgh, PA
K. Miller
BNFL, UK
C. Lombardi
Polytechnic of Milan, Milano, Italy
N. Todreas
Massachusetts Institute of Technology, Cambridge, MA
E. Greenspan
University of California at Berkeley, Berkeley, CA
H. Ninokata
TIT, Japan
F. Lopez
Bechtel, Ellicott City, MD
L. Cinotti
Ansaldo Nucleare, Italy
J. Collado
ENSA, Spain
F. Oriolo
Universita` di Pisa, Pisa, Italy
G. Alonso
ININ, Mexico
M. Moraes
NUCLEP, Brazil
R. Boroughs
TVA
A. Barroso
CNEN, Brazil
D. Ingersoll
ORNL, TN
N. Cavlina
FER, Croatia
Paper No:
ICONE10-22497, pp. 883-888; 6 pages
Published Online:
March 4, 2009
Citation
Carelli, MD, Miller, K, Lombardi, C, Todreas, N, Greenspan, E, Ninokata, H, Lopez, F, Cinotti, L, Collado, J, Oriolo, F, Alonso, G, Moraes, M, Boroughs, R, Barroso, A, Ingersoll, D, & Cavlina, N. "IRIS: Proceeding Towards the Preliminary Design." Proceedings of the 10th International Conference on Nuclear Engineering. 10th International Conference on Nuclear Engineering, Volume 2. Arlington, Virginia, USA. April 14–18, 2002. pp. 883-888. ASME. https://doi.org/10.1115/ICONE10-22497
Download citation file:
14
Views
Related Proceedings Papers
Related Articles
The Effects of Maintenance Actions on the Average Probability of Failure on Demand of Spring Operated Pressure Relief Valves
J. Pressure Vessel Technol (December,2015)
Development of Risk Informed Aging Management Program in Decommissioning
ASME J of Nuclear Rad Sci (January,2025)
Facility Integrity Management and Assessment of Associated Risk Conditions
J. Pressure Vessel Technol (August,2016)
Related Chapters
Use of PSA in Lisencing of EPR 1600 in Finland (PSAM-0160)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Identification and Analysis of Risk
Managing Risks in Design & Construction Projects
ASME Section VI: Recommended Rules for the Care and Operation of Heating Boilers
Companion Guide to the ASME Boiler & Pressure Vessel Codes, Volume 1 Sixth Edition