This paper presents a mathematical model of the UPROB (planning system for construction and overhaul) system that was developed for tank assembly lines, construction of thermal energy structures, and for performing an overhaul in complex plants. Planning technology includes utilizing linear diagrams with a direct usage of input data from a plant’s database. A model has been developed to determine the critical path and also, to define steps for the most economical shortening of the entire plan. Several plan variations are developed (according to specified goals) and the management determines the optimal variation. After selecting a plan, it is possible to control and create work orders for individual tasks in certain activities. Task completion percentage, activity cost, and the total cost of the plan are also provided.
Skip Nav Destination
10th International Conference on Nuclear Engineering
April 14–18, 2002
Arlington, Virginia, USA
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
0-7918-3595-2
PROCEEDINGS PAPER
A Model for Shortening the Length of Activities in Construction and Overhaul Planning: UPROB Available to Purchase
Niko Majdandzˇic´,
Niko Majdandzˇic´
University of Osijek, Slavonski Brod, Croatia
Search for other works by this author on:
Slavko Sebastijanovic´,
Slavko Sebastijanovic´
University of Osijek, Slavonski Brod, Croatia
Search for other works by this author on:
Gordana Maticˇevic´,
Gordana Maticˇevic´
University of Osijek, Slavonski Brod, Croatia
Search for other works by this author on:
Nebojsˇa Sebastijanovic´
Nebojsˇa Sebastijanovic´
University of California at Santa Barbara, Santa Barbara, CA
Search for other works by this author on:
Niko Majdandzˇic´
University of Osijek, Slavonski Brod, Croatia
Slavko Sebastijanovic´
University of Osijek, Slavonski Brod, Croatia
Gordana Maticˇevic´
University of Osijek, Slavonski Brod, Croatia
Nebojsˇa Sebastijanovic´
University of California at Santa Barbara, Santa Barbara, CA
Paper No:
ICONE10-22239, pp. 61-66; 6 pages
Published Online:
March 4, 2009
Citation
Majdandzˇic´, N, Sebastijanovic´, S, Maticˇevic´, G, & Sebastijanovic´, N. "A Model for Shortening the Length of Activities in Construction and Overhaul Planning: UPROB." Proceedings of the 10th International Conference on Nuclear Engineering. 10th International Conference on Nuclear Engineering, Volume 1. Arlington, Virginia, USA. April 14–18, 2002. pp. 61-66. ASME. https://doi.org/10.1115/ICONE10-22239
Download citation file:
8
Views
Related Proceedings Papers
Related Articles
A DEMATEL-Based Disassembly Line Balancing Heuristic
J. Manuf. Sci. Eng (February,2019)
U233 Data Evaluation for Criticality Study
ASME J of Nuclear Rad Sci (July,2016)
The Role of the Ceramic Heat Exchanger in Energy and Resource Conservation
J. Eng. Power (April,1980)
Related Chapters
Integration of PDM, ERP and MES through Single Source of Product Data for Product Design and Development
International Conference on Advanced Computer Theory and Engineering (ICACTE 2009)
Scope of Section I, Organization, and Service Limits
Power Boilers: A Guide to the Section I of the ASME Boiler and Pressure Vessel Code, Second Edition
Maine Yankee Atomic Power Plant
Decommissioning Handbook