The Radioactive Waste Disposal Facility (RWDF) Buryakovka was constructed in 1986 as part of the intervention measures after the accident at Chernobyl NPP (ChNPP). Today, the surface repository for solid low and intermediate level waste (LILW) is still being operated but its maximum capacity is nearly reached. Long-existing plans for increasing the capacity of the facility shall be implemented in the framework of the European Commission INSC Programme (Instrument for Nuclear Safety Co-operation).

Within the first phase of this project, DBE TECHNOLOGY GmbH prepared a safety analysis report of the facility in its current state (SAR) and a preliminary safety analysis report (PSAR) for a future extended facility based on the planned enlargement. In addition to a detailed mathematical model, also simplified models have been developed to verify results of the former one and enhance confidence in the results. Comparison of the results show that — depending on the boundary conditions — simplifications like modeling the multi trench repository as one generic trench might have very limited influence on the overall results compared to the general uncertainties associated with respective long-term calculations. In addition to their value in regard to verification of more complex models which is important to increase confidence in the overall results, such simplified models can also offer the possibility to carry out time consuming calculations like probabilistic calculations or detailed sensitivity analysis in an economic manner.

This content is only available via PDF.
You do not currently have access to this content.