Svensk Ka¨rnbra¨nslehantering AB (SKB) has performed comprehensive investigations of two candidate sites for a final repository for Sweden’s spent nuclear fuel. In March 2011 SKB decided to submit licence applications for a final repository at Forsmark. Before selection, SKB stated that the site that offers the best prospects for achieving long-term safety in practice would be selected. Based on experiences previous safety assessments, a number of issues related to long-term safety need to be considered in the context of site comparison. The factors include sensitivity to climate change such as periods of permafrost and glaciations, rock mechanics evolution including the potential for thermally induced spalling and sensitivity to potential future earthquakes, current and future groundwater flow, evolution of groundwater composition and proximity to mineral resources. Each of these factors related to long-term safety for the two candidate sites is assessed in a comparative analysis of site characteristics. The assessment also considers differences in biosphere conditions and in the confidence of the site descriptions. The comparison is concluded by an assessment on how the identified differences would affect the estimated radiological risk from a repository located at either of the sites. The assessment concludes that there are a number of safety related site characteristics for which the analyses do not show any decisive differences in terms of implications on safety, between the sites Forsmark and Laxemar. However, the frequency of water conducting fractures at repository depth is much smaller at Forsmark than at Laxemar. This difference, in turn, affects the future stability of the current favourable groundwater composition, which combined with the much higher flows at Laxemar would, for the current repository design, lead to a breach in the safety functions for the buffer and the canister for many more deposition positions at Laxemar than at Forsmark. Thereby the calculated risk for Forsmark will be considerably lower than that for Laxemar. What decided the choice is that Forsmark is thus mainly that it was judged to offer better prospects for achieving long-term safety in the final repository. Other factors considered included implications regarding repository construction and operation, difference in the footprint of the repository, comparisons regarding environment and health as well as social resources and local support.
Skip Nav Destination
ASME 2011 14th International Conference on Environmental Remediation and Radioactive Waste Management
September 25–29, 2011
Reims, France
Conference Sponsors:
- Nuclear Engineering Division and Environmental Engineering Division
ISBN:
978-0-7918-5498-3
PROCEEDINGS PAPER
Safety Assessment Input for Site Selection: The Swedish Example
Johan Andersson
Johan Andersson
JA Streamflow AB, Stockholm, Sweden
Search for other works by this author on:
Johan Andersson
JA Streamflow AB, Stockholm, Sweden
Paper No:
ICEM2011-59031, pp. 1179-1184; 6 pages
Published Online:
August 17, 2012
Citation
Andersson, J. "Safety Assessment Input for Site Selection: The Swedish Example." Proceedings of the ASME 2011 14th International Conference on Environmental Remediation and Radioactive Waste Management. ASME 2011 14th International Conference on Environmental Remediation and Radioactive Waste Management, Parts A and B. Reims, France. September 25–29, 2011. pp. 1179-1184. ASME. https://doi.org/10.1115/ICEM2011-59031
Download citation file:
7
Views
Related Proceedings Papers
Related Articles
The Fabulous Nuclear Odyssey of Belgium
J. Pressure Vessel Technol (June,2009)
Effect of Instantaneous Starting Pump on Fluid Transient Flow in Managed Pressure Cementing
J. Energy Resour. Technol (January,0001)
New Formulation for Sandstone Acidizing That Eliminates Sand Production Problems in Oil and Gas Sandstone Reservoirs
J. Energy Resour. Technol (July,2017)
Related Chapters
Development of Nuclear Boiler and Pressure Vessels in Taiwan
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 3, Third Edition
Use of PSA in Lisencing of EPR 1600 in Finland (PSAM-0160)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Lessons Learned: NRC Experience
Continuing and Changing Priorities of the ASME Boiler & Pressure Vessel Codes and Standards