The programme for disposal of radioactive waste in Japan is now moving ahead on a number of fronts. On the regulatory side, responsibility for TRU waste disposal has been assigned to NUMO and guidelines for the safety goals for disposal of LLW have been published. NUMO, as the implementer for the deep geological disposal programme, has been developing the special tools for project management that are needed as a result of the decision to adopt a volunteering approach to siting. NUMO is also building up the technical infrastructure for flexible tailoring of site characterisation, repository design and the associated safety assessment to the conditions found in any volunteer site. This work requires openness and transparency in decision-making but, as several sites may need to be investigated in parallel, particular emphasis is placed on operational practicality.