The decommissioning of major nuclear plant facilities will inevitably involve a number of project areas where significant levels of processing and manufacturing tasks are required. Typically this includes key task areas such as: • ILW materials retrievals and handling; • ILW / LLW materials processing and encapsulation; • Contaminated surfaces remediation; • Import of materials at dedicated ILW Stores. All such areas involve a series of high level project stages: 1) Design, install and commission facilities; 2) Operate facilities to complete the project tasks (retrievals, processing etc); 3) Post Operative Clean Out and final removal of plant and buildings. The time periods involved with the second (operational) stages have, in many cases, planned durations that are measured in terms of years rather than months. Variations in achieved performance levels can have a much higher impact on the project completion dates than is often appreciated. Given that material processing operations often constitute key critical path elements of the wider site decommissioning timing plans, it follows that any delays are likely to extend site completion dates and can incur costs at a rate of many millions of pounds per year. This paper outlines the often unforeseen risks inherent in the processing/manufacturing activities in this phase of decommissioning and identifies the typical root causes and issues that contribute to operational losses. This paper holds that many of these risks can be largely anticipated and mitigated in the design stages if an operational perspective is applied with appropriate tools. Since many of the projects involved in decommissioning have singular and challenging engineering requirements there is a heightened need to focus on potential processing issues from the earliest project stages. Therefore project phases from initial concept design right through to successful completion are considered. The text details a range of operational improvement methods and techniques (along with illustrations from specific projects) that are increasingly being adopted to mitigate the risks of significant project delays and overspend in the nuclear sector. Importantly, these tools are underpinned by realistic operational data to guide and support project and engineering decisions. This approach has been effectively deployed in a number of strategically important projects within the current BNFL and BNFL Environmental Services decommissioning programs. This paper argues that despite the levels of general engineering and technical excellence found within the Nuclear Industry, there remains a need to encompass ‘best practice’ methodologies from other industries. Specifically, this paper argues for the increasing adoption of manufacturing improvement methodologies that have been successfully developed in other industries (notably the automotive, pharmaceutical and technology sectors) to promote robust designs that subsequently deliver effective and efficient plants. This paper holds that these techniques can be successfully incorporated into process dependant decommissioning projects, and that, without utilisation of such methods, the taxpayers of countries participating in these programmes are unlikely to get value for money.
Skip Nav Destination
ASME 2003 9th International Conference on Radioactive Waste Management and Environmental Remediation
September 21–25, 2003
Oxford, England
Conference Sponsors:
- Nuclear Engineering Division and Environmental Engineering Division
ISBN:
0-7918-3732-7
PROCEEDINGS PAPER
Application of Best Practice Manufacturing Methodologies to Support Achievement of Planned Decommissioning Timescales and Costs
I. L. Sturgeon,
I. L. Sturgeon
OEE Consulting, Ltd., Oxfordshire, UK
Search for other works by this author on:
J. B. Thomson
J. B. Thomson
BNFL, Ltd., Warrington, England
Search for other works by this author on:
I. L. Sturgeon
OEE Consulting, Ltd., Oxfordshire, UK
J. B. Thomson
BNFL, Ltd., Warrington, England
Paper No:
ICEM2003-4625, pp. 1001-1010; 10 pages
Published Online:
February 24, 2009
Citation
Sturgeon, IL, & Thomson, JB. "Application of Best Practice Manufacturing Methodologies to Support Achievement of Planned Decommissioning Timescales and Costs." Proceedings of the ASME 2003 9th International Conference on Radioactive Waste Management and Environmental Remediation. 9th ASME International Conference on Radioactive Waste Management and Environmental Remediation: Volumes 1, 2, and 3. Oxford, England. September 21–25, 2003. pp. 1001-1010. ASME. https://doi.org/10.1115/ICEM2003-4625
Download citation file:
6
Views
Related Proceedings Papers
Related Articles
Thermal Issues in Materials Processing
J. Heat Transfer (June,2013)
A State-of-the-Art Review on Hemming: A Materials Processing Technology for Mechanical Joints
Appl. Mech. Rev (March,2022)
A Happy New Year…
ASME J of Nuclear Rad Sci (January,2019)
Related Chapters
Subsection NF—Supports
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 1, Third Edition
Subsection NF—Supports
Companion Guide to the ASME Boiler & Pressure Vessel Code, Volume 1, Second Edition
Czech and Slovakian Codes
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 3, Third Edition