This paper discusses the reliability and integrity management (RIM) strategies that have been applied in the design of the PBMR passive metallic components for the helium pressure boundary (HPB) to meet reliability targets and to evaluate what combination of strategies are needed to meet the targets. The strategies considered include deterministic design strategies to reduce or eliminate the potential for specific damage mechanisms, use of an on-line leak monitoring system and associated design provisions that provide a high degree of leak detection reliability, and periodic non-destructive examinations combined with repair and replacement strategies to reduce the probability that degradation would lead to pipe ruptures. The PBMR RIM program for passive metallic piping components uses a leak-before-break philosophy. A Markov model developed for use in LWR risk-informed inservice inspection evaluations was applied to investigate the impact of alternative RIM strategies and plant age assumptions on the pipe rupture frequencies as a function of rupture size. Some key results of this investigation are presented in this paper.

This content is only available via PDF.
You do not currently have access to this content.