The Gas Turbine High Temperature Gas Cooled Reactor (GT-HTGR) power plant combines the existing HTGR core with a closed-cycle helium gas turibne power-conversion system directly in the reactor primary circuit. An integrated design concept in which the reactor core, turbomachinery, heat exchangers, and entire helium inventory are enclosed within the prestressed concrete reactor vessel (PCRV) was selected on the basis of both safety and economic reasons. Th layout of the power-conversion loop (PCL) components, with envelope restraints associated with installation in cavities in the PCRV, and development of the primary system gas flow paths are discussed. This paper outlines the studies which led to the selection of the primary system for an integrated type of plant embodying multiple gas turbine loops. With orientation and configuration of the major components in the PCL forming the basis of these studies, some of the preliminary design considerations for the turbomachinery, heat exchangers, and other components are discussed. The high potential for further improvement in plant efficiency and capacity, for both advanced dry-cooled and waste heat power cycle versions of the direct cycle nuclear gas turbine, is also discussed.
Skip Nav Destination
ASME 1976 International Gas Turbine and Fluids Engineering Conference
March 21–25, 1976
New Orleans, Louisiana, USA
Conference Sponsors:
- International Gas Turbine Institute
ISBN:
978-0-7918-7975-7
PROCEEDINGS PAPER
Primary System Preliminary Design for Gas Turbine HTGR Power Plant Free
C. F. McDonald,
C. F. McDonald
General Atomic Company, San Diego, CA
Search for other works by this author on:
P. Fortescue,
P. Fortescue
General Atomic Company, San Diego, CA
Search for other works by this author on:
J. M. Krase
J. M. Krase
General Atomic Company, San Diego, CA
Search for other works by this author on:
C. F. McDonald
General Atomic Company, San Diego, CA
P. Fortescue
General Atomic Company, San Diego, CA
J. M. Krase
General Atomic Company, San Diego, CA
Paper No:
76-GT-92, V01BT02A027; 16 pages
Published Online:
April 22, 2015
Citation
McDonald, CF, Fortescue, P, & Krase, JM. "Primary System Preliminary Design for Gas Turbine HTGR Power Plant." Proceedings of the ASME 1976 International Gas Turbine and Fluids Engineering Conference. Volume 1B: General. New Orleans, Louisiana, USA. March 21–25, 1976. V01BT02A027. ASME. https://doi.org/10.1115/76-GT-92
Download citation file:
270
Views
Related Proceedings Papers
Related Articles
Heat Exchanger Design Considerations for Gas Turbine HTGR Power Plant
J. Eng. Power (April,1977)
The Nuclear Closed-Cycle Gas Turbine (HTGR-GT)—Dry Cooled Commercial Power Plant Studies
J. Eng. Power (January,1981)
Related Chapters
Physiology of Human Power Generation
Design of Human Powered Vehicles
Studies Performed
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Threshold Functions
Closed-Cycle Gas Turbines: Operating Experience and Future Potential