The performance of a gas turbine is normally guaranteed at 80 F, with derating occurring for temperatures above this point. This reduction in capability must be provided for by either installing an “oversized” turbine or means by which the horsepower lost due to derating can be provided by at least two methods. This paper reports on test work that was done to provide the incremental power and evaluates their comparative cost.

This content is only available via PDF.