A 300-hp recuperative gas-turbine engine is described, and the results of performance tests ore presented. Factors influencing selection of principal design features are discussed. Considerations involved in arranging generator-set components and selecting a waste-heat boiler to meet installation requirements of an EFL power package application are reviewed.

This content is only available via PDF.