Procurement of process plant equipment involves decisions based not only on an economic agenda but also on long term plant capability, which in turn depends on equipment reliability. As the greater global community raises environmental concerns and pushes for economic reform, a tool is evermore required for specific and critical selection of plant equipment. Risk assessments based on NASA’s Technology Readiness Level (TRL) scale have been employed in many previous risk models to map technology in terms of risk and reliability. The authors envisage a scale for quantifying technical risk. The focus of this paper is the technical risk assessment of gas turbines as mechanical drivers for producing Liquefied Natural Gas (LNG). This risk assessment is a cornerstone of the TERA philosophy, a Technoeconomic and Environmental Risk Analysis developed by Cranfield University’s Department of Power and Propulsion in the UK. Monte Carlo simulations are used in order to compare the risks of introducing new plant equipment against existing and established plant equipment. Three scenarios are investigated using an 87MW single spool, typical industrial machine; a baseline engine followed by an engine with increased firing temperature and finally an engine with a zero staged compressor. The results suggest that if the baseline engine was to be upgraded then the zero staging option would be a better solution than increasing firing temperature since zero staging gives the lower rise in Total Time to Repair (TTTR), or downtime. The authors suggest a scaling system based on NASA’s TRL but with modified definition criteria for the separate technology readiness levels in order to better relate the scale to gas turbine technology. The intention is to link the modified TRL to downtime, since downtime has been identified as a quantitative measure of technical risk. Latest developments of the modelling are looking at integrating risk analysis and a maintenance cost and scheduling model to provide a platform for total risk assessment. This, coupled with emissions modelling, is set to provide the overall TERA tool for LNG technology selection.
Skip Nav Destination
ASME Turbo Expo 2010: Power for Land, Sea, and Air
June 14–18, 2010
Glasgow, UK
Conference Sponsors:
- International Gas Turbine Institute
ISBN:
978-0-7918-4400-7
PROCEEDINGS PAPER
Risk Analysis of Gas Turbines for Natural Gas Liquefaction Available to Purchase
Raja S. R. Khan,
Raja S. R. Khan
Cranfield University, Bedfordshire, UK
Search for other works by this author on:
Maria Chiara Lagana,
Maria Chiara Lagana
Cranfield University, Bedfordshire, UK
Search for other works by this author on:
Steven O. T. Ogaji,
Steven O. T. Ogaji
Cranfield University, Bedfordshire, UK
Search for other works by this author on:
Pericles Pilidis,
Pericles Pilidis
Cranfield University, Bedfordshire, UK
Search for other works by this author on:
Ian Bennett
Ian Bennett
Shell Global Solutions International, The Hague, The Netherlands
Search for other works by this author on:
Raja S. R. Khan
Cranfield University, Bedfordshire, UK
Maria Chiara Lagana
Cranfield University, Bedfordshire, UK
Steven O. T. Ogaji
Cranfield University, Bedfordshire, UK
Pericles Pilidis
Cranfield University, Bedfordshire, UK
Ian Bennett
Shell Global Solutions International, The Hague, The Netherlands
Paper No:
GT2010-23261, pp. 733-743; 11 pages
Published Online:
December 22, 2010
Citation
Khan, RSR, Lagana, MC, Ogaji, SOT, Pilidis, P, & Bennett, I. "Risk Analysis of Gas Turbines for Natural Gas Liquefaction." Proceedings of the ASME Turbo Expo 2010: Power for Land, Sea, and Air. Volume 5: Industrial and Cogeneration; Microturbines and Small Turbomachinery; Oil and Gas Applications; Wind Turbine Technology. Glasgow, UK. June 14–18, 2010. pp. 733-743. ASME. https://doi.org/10.1115/GT2010-23261
Download citation file:
15
Views
Related Proceedings Papers
Related Articles
Risk Assessment Methodology for Electric-Current Induced Drowning Accidents
ASME J. Risk Uncertainty Part B (September,2016)
Systematic Evaluation of U.S. Navy LM2500 Gas Turbine Condition
J. Eng. Gas Turbines Power (July,2002)
Infrastructure Decay Modeling With the Input-Output Inoperability Model
ASME J. Risk Uncertainty Part B (March,2015)
Related Chapters
QRAS Approach to Phased Mission Analysis (PSAM-0444)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
SAPHIRE — Past, Present and Future (PSAM-0279)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Performance Testing of Combined Cycle Power Plant
Handbook for Cogeneration and Combined Cycle Power Plants, Second Edition