Emprise Corporation designed and managed construction for a new state-of-the-art facility (Test Stand 8) and for a radical upgrade and renovation of a circa 1972 test facility (Test Stand 3). General Electric will use Test Stand 8 for prototype 9H (50 Hz) gas turbine testing, and will use Test Stand 3 for 7F (60 Hz) gas turbine testing. This paper summarizes the unique challenges and innovative solutions that were required for these projects.

This content is only available via PDF.
You do not currently have access to this content.