This paper describes various designs of large CFBs that ALSTOM has undertaken in the last several years. We discuss available operational results of Red Hills (2 × 250 MW) and AES Puerto Rico Total Energy Project (2 × 255 MW). Also included is a description and overview of three projects that are nearing completion: Reliant Energy – Seward Repowering Project (2 × 294 MW); East Kentucky Power Cooperative – E. A. Gilbert (1 × 294 MW); and ENEL – Sulcis Repowering Project (1 × 340 MW gross). Each of these projects had individual technical challenges and solutions, which will be reviewed.

This content is only available via PDF.
You do not currently have access to this content.