1-2 of 2
Keywords: augmentation
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Proc. ASME. ESDA2008, Volume 1: Advanced Energy Systems; Advanced and Digital Manufacturing; Advanced Materials; Aerospace, 25-33, July 7–9, 2008
Publisher: American Society of Mechanical Engineers
Paper No: ESDA2008-59181
... 09 07 2009 Water fogging of inlet air has become widely acceptable for gas turbine power augmentation. Fogging systems are generally designed for a specific set of conditions called the design point. As a rule, the design point is specified to provide the maximum capacity...
Proceedings Papers

Proc. ASME. ESDA2006, Volume 1: Advanced Energy Systems, Advanced Materials, Aerospace, Automation and Robotics, Noise Control and Acoustics, and Systems Engineering, 11-19, July 4–7, 2006
Publisher: American Society of Mechanical Engineers
Paper No: ESDA2006-95020
... widely acceptable for gas turbine power augmentation. Fogging systems are generally designed for a specific set of conditions called the design point. As a rule, the design point is specified to provide the maximum capacity of the fogging system at extreme ambient temperatures, when gas turbine power...